Project
To provide a timelapse camera covering the demolition works of the road bridge during a short term engineering possession of the Reading, Berkshire line.

 
Challenges

Remote railway location
Generator based power only
No Internet access
Limited Cellular network coverage
Christmas and Boxing Day time period
Specific Health and Safety Requirements
48hrs continuous shooting