Project

To provide a timelapse camera covering the demolition works of the road bridge during a short term engineering possession of the Reading, Berkshire line.

 

Challenges

  • Remote railway location
  • Generator based power only
  • No Internet access
  • Limited Cellular network coverage
  • Christmas and Boxing Day time period
  • Specific Health and Safety Requirements
  • 48hrs continuous shooting