Project
To provide a timelapse camera covering the demolition works of the road bridge during a short term engineering possession of the Reading, Berkshire line.
Challenges
- Remote railway location
- Generator based power only
- No Internet access
- Limited Cellular network coverage
- Christmas and Boxing Day time period
- Specific Health and Safety Requirements
- 48hrs continuous shooting