Commercial Warehouse Time Lapse with Motion Control

Project
This time lapse project is the second large scale motion control camera rig installation for Industrial and Commercial clients. This coupled with a standard fixed time lapse camera provides a more visually stimulating video. As with each time lapse project the Challenges are overcome to produce a great outcome.

 
Challenges

Fast pace of work
Mobile power generators – […]

50 foot Camera Run – Industrial Motion Control Time Lapse

Project
This time lapse project is one of the first large scale motion control test rigs for Industrial and Commercial clients. It demonstrates the potential.

 
Challenges

Fast pace of work
Limited working space
New camera rig setup
Busy working environment with multiple trades on site
Uneven floor for camera run

Bakery Court Beaconsfield Bucks

Project
To provide a timelapse camera covering the demolition of the existing building and the construction of a mixed retail and residential development.
Challenges

18 month project
Roof top camera location
All Weather camera unit
Cellular internet access only
Wide angle field of view – 10mm

 

Credits
Music courtesy of www.bensound.com

Whitchurch Bridge South Oxfordshire

Project
To provide a timelapse camera covering the demolition and replacement of the road bridge over a 9 month time period.

 Challenges

All weather camera unit
Riverside Location with extensive flooding
Delayed live feed of images to a web site
50m cable runs for both 110v power and wired internet access
Secure mounting on public foot bridge
Weekday shooting only during working hours

Credits
Video […]

West Ham Tube Station London

Project
To provide a timelaspe camera covering the points and track replacement during a weekend engineering possession.

 
Challenges

Remote rail line location
Specific Health and Safety requirements
All weather camera unit
No internet access for monitoring
Signal gantree mounting
48hrs continuous shooting

Purley on Thames Berkshire

Project
To provide a timelapse camera covering the demolition works of the road bridge during a short term engineering possession of the Reading, Berkshire line.

 
Challenges

Remote railway location
Generator based power only
No Internet access
Limited Cellular network coverage
Christmas and Boxing Day time period
Specific Health and Safety Requirements
48hrs continuous shooting

The Routemaster Bus Timelapse

Transport for London – Routemaster Bus
Project
This timelaspe was a challenging and exciting project to work on. We worked in partnership with TfL, Wrightbus in Ireland and a media company to install and timelapse the building of the new bus. We had a challenging install location meaning flights to Northern Ireland, concerns from the employees and […]